Home Hugh Piggott Workshop 2009 Hugh Piggott Workshop 2009 (sort of blog) Workshop Setup

Hugh Piggott Workshop 2009 (sort of blog) Workshop Setup

E-mail Print PDF

Day 6
We  went to visit Andy and Margaret to see where the new turbine will be going.


Discussing the wiring for the new system
 
This should be a windy spot, it has good height and is open
 
 Another view of the proposed site
 
 
Robert is making a wish on a wishing tree, the whitethorn or hawthorn tree is the old Celtic pagan wishing tree
 
 
Andy's Bennelli 650 (because Jimmy likes bikes too)






 Day 5
We set up the Cran Óg wind powered internet café and now all lost in cyberspace. 


 





Setup Day 4
The sun was out again today and we finished setting up the workshop space.


Welding workshop, the over exposed bits in the photo are unusual here this summer
 
Hugh arrived in Galway airport now it's all systems go.
Next update will hopefully be on Monday






Setup Day 3
A better day with the sun shining but some big showers.

The roof got finished on the new space with some help from Toirneach the horse and Shadow dog


We laminated two big planks out of 4x2 red deal with epoxy resin

Using nice big clamps

We ended up with 4 blanks for a 4.8m turbine. On the right is a set of blades for a 4.2m machine a bit hard to see. And in the middle is a cedar blank for a 2.4m turbine.

Last Updated on Tuesday, 06 October 2009 11:29  

Weather

Enniskillen
Wind Speed 1.0m/s
Enniskillen 4°C | Derry 5°C | Knock -1°C | Shannon 1°C | Cork -4°C | Dublin -4°C | Belfast 7°C | Stornoway 4°C
[Details]

Who's Online

  • [Bot]
  • [Yahoo]
Now online:
  • 1 guest
  • 2 robots
Total visitors:6527
Vistors a day:46

Newsflash

Get Hugh Piggotts book A Wind Turbine Recipe Book for €15