Home Hugh Piggott Workshop 2009 Hugh Piggott Workshop 2009 (sort of blog) Day6

Hugh Piggott Workshop 2009 (sort of blog) Day6

E-mail Print PDF
AddThis Social Bookmark Button

Day 6

Hughs Video




Again nice sunshine and a gentle breeze we got a peak output of 500w and an average of 100w over 3 hours.



The crew Left to Right
Niall, James, Josie, Trevor, Greer, Joe, Andy, Jimmy (hidden), Graham, Brendan, John, Trevor, Robert, Patrick, Colin, Paddy, Colm, Enda
Inset Mary and Paddy who had to leave early and missed seeing the turbine up in the air

 
Where people came from



The blades are carefully carried to the site



Joe securing the wire coming through the mast to ensure that it does not disappear



The blades are now in place and the tail is on



Looking good!



There she goes, on the way up



Wow, it looks good!


 
Andy and Margaret admiring the turbine which will be going to their site



The finished product, a weeks work for the crew on Crann Og Workshop 09



Last Updated on Tuesday, 06 October 2009 11:32  

Workshop Schedule

PayPal Donate

Help us to keep this site going

Search the Forum

Keyword

Weather

Enniskillen
Wind Speed 4.1m/s
Enniskillen 7°C | Derry 6°C | Knock 7°C | Shannon 7°C | Cork 6°C | Dublin 6°C | Belfast 4°C | Stornoway 4°C
[Details]

Who's Online

Now online:
  • 11 guests
  • 4 robots
Total visitors:42426
Vistors a day:51

Newsflash

Irish Seed Savers Association, Capparoe, Scarriff, Co. Clare

This is a hands-on, practical day. We will be installing a PV (photovoltaic) system to run a few small lights at the cob house. This will be a 12volt, off-grid system running LED lighting. First we will explain what the various components of the system are and how the system will work. Then it's outside where we will be installing the PV panel, running cables, installing the lights, placing batteries in their enclosure and wiring them up, connecting the system up and switching on the lights.

For booking click here