This week we are making a 3.1 metre 24v wind turbine using Austrian larch for the blades.

Cutting blade blanks
Stuart cuts out the a blade blank


It got off to a nice start and at the end of the day the flat face of two blades was almost finished.

Working on the face of the blade
Donal and Jim work on the flat face

We had to abandon one of the blade blanks because the grain seemed very soft compared to the other two and no mater what way you used the draw knife it kept taking big chunks out but luckily we had another blank and that seems fine.

We also got a start made on the frame.

Steel wind turbine frame
Pat and Jimmy check the stator mounting points for flatness

{sharethis}

Last Updated on Monday, 15 February 2010 23:38  

Workshop Schedule

PayPal Donate

Help us to keep this site going

Search the Forum

Keyword

Weather

Enniskillen
Wind Speed 5.7m/s
Enniskillen 6°C | Derry 6°C | Knock 8°C | Shannon 7°C | Cork 4°C | Dublin 5°C | Belfast 7°C | Stornoway 5°C
[Details]

Who's Online

Now online:
  • 4 guests
  • 3 robots
Total visitors:42593
Vistors a day:51

Newsflash

Irish Seed Savers Association, Capparoe, Scarriff, Co. Clare

This is a hands-on, practical day. We will be installing a PV (photovoltaic) system to run a few small lights at the cob house. This will be a 12volt, off-grid system running LED lighting. First we will explain what the various components of the system are and how the system will work. Then it's outside where we will be installing the PV panel, running cables, installing the lights, placing batteries in their enclosure and wiring them up, connecting the system up and switching on the lights.

For booking click here